Many mid-rise multifamily and senior-housing buildings are served by a central chilled-water plant: one or two air-cooled chillers feeding a loop, with a fan coil unit in every apartment. When a chiller fails, the natural instinct is to replace the chiller. We recommend scoping the plant and the fan coils together.
One property we assessed is typical. An 82-unit mid-rise built in 2012 was served by two 80-ton air-cooled scroll chillers. One had failed outright. The other was running, but with a variable-frequency drive that overheated and shut the chiller down intermittently, and condenser coils in severe decline. All 82 fan coils were degraded.
1. System performance is gated by the fan coils
A new chiller produces precisely controlled chilled water. Comfort in the apartment still depends on the terminal unit. Fouled coils, worn blower motors, deteriorated drain pans and weak control valves keep the new chiller’s capacity from becoming in-unit cooling.
2. Operating efficiency is compromised
High-efficiency chillers are engineered for a specific load profile. Aged fan coils with fouled coils force the chiller to produce colder leaving water and run outside its efficiency envelope, which erodes the energy savings that justified the investment.
3. Old equipment contaminates new equipment
Scale, biofilm and corrosion debris accumulated in old fan coils and loop piping are mobilized when a new chiller comes online at higher flow rates and with updated water chemistry. Replacing both at once allows the loop to be flushed, treated and commissioned as a single integrated system.
4. Mobilization and disruption are largely shared
Rigging, crane access, mechanical-room work, loop draining and refilling, controls recommissioning and tenant notice cycles overlap between chiller and fan coil work. Doing both concurrently reduces total project cost and disturbs occupied units once instead of twice.
What the combined scope looks like
- Full replacement of the failed chiller, like-for-like, including rigging, piping, start-up and commissioning.
- Condenser coil replacement on the surviving chiller, with refrigerant recovery, recharge and start-up.
- Variable-frequency drive replacement on the surviving chiller.
- Re-insulation of mechanical-room water lines.
- In-unit fan coil replacement across the building, integrated with the plant work.
- A loop flush, chemical clean and clean operating baseline before commissioning.
Written by the Air Force Mechanical team from field assessments and active programs.
General guidance only. Confirm code and regulatory requirements for your property.