Diligence & capital assessments
Know the number before you go hard.
A mechanical assessment written the way an owner reads: focused on what protects net operating income, insurability and resident comfort, rather than a simple equipment list.
Lever 1
$10,500 a door, found before closing.
In our illustrative 1,000-unit model, the walkthrough puts $10.5M of real capital need in front of your investment team before the deposit goes hard. The aim is not to kill the deal. It is to avoid overpaying, and to have capex financing in place for the ownership life cycle.
| System | Basis | 1,000 units |
|---|---|---|
| HVAC | $7,000 a system across 50% of units | $3.5M |
| Ductwork | $2,000 a unit | $2.0M |
| Electrical | $2,000 a unit | $2.0M |
| Roofing | $3,000 a unit | $3.0M |
| Total | $10,500 a door | $10.5M |
Illustrative figures for a twenty-year-old, 1,000-unit property.
The report
What lands on your desk.
Built for capital planning and negotiation, not a generic punch list.
- 01Key takeaways
- What cannot wait, what is ordinary recurring capital, and what is still unknown, in language an investment committee can act on.
- 02Refrigerant census
- The fleet split across R-22, R-410A and A2L equipment, with ages from the data plates.
- 03Year-by-year spend
- Year 0 separated from the steady program, with a unit pricing menu and the quantity assumptions behind each total.
- 04Below-the-line items
- Scopes that are real but not yet understood, such as electrical, carried separately with a path to resolving them.
- 05Other building systems
- Roofing, gutters, siding and plumbing summarized with their insurance implications, even where they sit outside our scope.
- 06Photographic record
- Every system, data plate, line set and panel we looked at, grouped by system.
Representative work sample
Three pages from a real portfolio assessment.
Excerpted from an assessment prepared for a multifamily affordable and senior-housing owner. Client and property names, locations, pricing and serial numbers have been removed. It covers a failed central chiller plant, why chillers and fan coils are scoped together, coastal equipment protection and refrigerant compliance.
Process
From first walk to a number you can underwrite.

- 01
Walk
We walk representative buildings and photograph each system. A first pass on a large community takes a day.
- 02
Reconcile
The team reconciles field notes and pressure-tests assumptions against the property’s service history.
- 03
Report
A Phase 1 rough-order-of-magnitude report: directional figures with a stated range, usually around 10%.
- 04
Firm
Two to three further field days deepen the sample to 10 to 15% of units and bring electrical, ductwork and plumbing specialists on site.
- 05
Defend
We stand behind the plan in front of a lender, a carrier or a buyer at disposition.
After closing
The inspection is the first of three levers.
The same census that protects the purchase price sets up the replacement program and the maintenance plan. Together they are worth roughly $24M on a $45M equity check in our model.
Diligence insights
What a pre-acquisition mechanical census should put in front of your investment committee
A punch list tells you what is broken today. A census tells you what the next five years cost and which numbers are still estimates.
November 3, 2026 · 6 min readComplianceR-22 cannot wait. R-410A can. Underwriting the refrigerant transition
Two refrigerant rules shape every multifamily capital plan. One creates a deadline. The other creates a schedule.
October 22, 2026 · 5 min readDiligenceChallenger panels, four-point inspections and Florida insurability
An in-unit electrical panel can decide what a carrier will write. Why we carry it below the line until the right people have weighed in.
August 27, 2026 · 5 min readGet in touch
Send us a deal.
Give us a deal you are working on, or a building you are getting ready to exit. We will tell you what a walk would cover and how quickly we can be on site.
- Principal
- Jason Schwartz
(305) 335-6991 · jason@airforceteam.com - 24/7 service line
- (754) 225-9220
- Headquarters
- 4350 NW 19th Ave, Unit E, Deerfield Beach, FL 33064
- Licenses
- FL Mechanical (HVAC) CAC1820262 · FL Plumbing CFC1433992