Know the number before you go hard.

A mechanical assessment written the way an owner reads: focused on what protects net operating income, insurability and resident comfort, rather than a simple equipment list.

Lever 1

$10,500 a door, found before closing.

In our illustrative 1,000-unit model, the walkthrough puts $10.5M of real capital need in front of your investment team before the deposit goes hard. The aim is not to kill the deal. It is to avoid overpaying, and to have capex financing in place for the ownership life cycle.

What the census finds
SystemBasis1,000 units
HVAC$7,000 a system across 50% of units$3.5M
Ductwork$2,000 a unit$2.0M
Electrical$2,000 a unit$2.0M
Roofing$3,000 a unit$3.0M
Total$10,500 a door$10.5M

Illustrative figures for a twenty-year-old, 1,000-unit property.

The report

What lands on your desk.

Built for capital planning and negotiation, not a generic punch list.

01Key takeaways
What cannot wait, what is ordinary recurring capital, and what is still unknown, in language an investment committee can act on.
02Refrigerant census
The fleet split across R-22, R-410A and A2L equipment, with ages from the data plates.
03Year-by-year spend
Year 0 separated from the steady program, with a unit pricing menu and the quantity assumptions behind each total.
04Below-the-line items
Scopes that are real but not yet understood, such as electrical, carried separately with a path to resolving them.
05Other building systems
Roofing, gutters, siding and plumbing summarized with their insurance implications, even where they sit outside our scope.
06Photographic record
Every system, data plate, line set and panel we looked at, grouped by system.

Representative work sample

Three pages from a real portfolio assessment.

Excerpted from an assessment prepared for a multifamily affordable and senior-housing owner. Client and property names, locations, pricing and serial numbers have been removed. It covers a failed central chiller plant, why chillers and fan coils are scoped together, coastal equipment protection and refrigerant compliance.

Process

From first walk to a number you can underwrite.

A project team reviewing building plans at a conference table
  1. 01

    Walk

    We walk representative buildings and photograph each system. A first pass on a large community takes a day.

  2. 02

    Reconcile

    The team reconciles field notes and pressure-tests assumptions against the property’s service history.

  3. 03

    Report

    A Phase 1 rough-order-of-magnitude report: directional figures with a stated range, usually around 10%.

  4. 04

    Firm

    Two to three further field days deepen the sample to 10 to 15% of units and bring electrical, ductwork and plumbing specialists on site.

  5. 05

    Defend

    We stand behind the plan in front of a lender, a carrier or a buyer at disposition.

After closing

The inspection is the first of three levers.

The same census that protects the purchase price sets up the replacement program and the maintenance plan. Together they are worth roughly $24M on a $45M equity check in our model.

Read: from inspection to exit
$150.0MToday+$10.5MInspection+$11.0MOpex → capex+$2.3MMaintenance$173.8MAt exit
Illustrative model: 1,000 units at $150,000 a door, 5.5% exit cap. Vertical axis starts at $140M. Maintenance lever includes $500K of cash retained during the hold.

Get in touch

Send us a deal.

Give us a deal you are working on, or a building you are getting ready to exit. We will tell you what a walk would cover and how quickly we can be on site.

Principal
Jason Schwartz
(305) 335-6991 · jason@airforceteam.com
24/7 service line
(754) 225-9220
Headquarters
4350 NW 19th Ave, Unit E, Deerfield Beach, FL 33064
Licenses
FL Mechanical (HVAC) CAC1820262 · FL Plumbing CFC1433992

No obligation. We reply within one business day.