A rough-order-of-magnitude capital assessment for an 810-unit, 50-building garden-style community, built from three representative buildings. Property details anonymized.

The fleet split three ways: roughly 175 systems on R-22, 615 on R-410A and 25 on newer A2L refrigerant. The R-22 units were the one item that could not wait. The R-410A fleet, at an estimated average age near ten years, was mid-to-late life but fully serviceable, so we proposed replacing about 75 a year as an ongoing capital line rather than a one-time event.
Every plenum we opened showed mold, and the plenums sat low, in exactly the on-grade moisture that breeds it. We scoped a new raised plenum into each system swap, where crews would already be working. Several units shared a single condensate drain across three floors with no secondary safety switches, so drip pans and float switches went into Year 0.
The in-unit electrical panels were a 30-year-old product line that Florida carriers and four-point inspectors routinely flag. Rather than put a hard number on a scope we had only partly seen, we carried electrical below the capital total and recommended a coordinated review with the inspector, the broker and the carrier.
Roofs, gutters and siding sat outside mechanical scope but were material to the investment, so they were summarized with their insurance implications. The report closed with the verification work needed to bring a Phase 1 estimate to the standard an institutional buyer would underwrite against.