Capability AFM-02
Packaged RTU changeouts, split and VRF replacement, air- and water-cooled chillers, with crane logistics and phased cutovers built around occupied buildings.
Replacement is where capital plans succeed or stall. We run replacements as programs rather than one-off jobs: a steady annual cadence for the mid-life fleet, a hard deadline for anything on R-22, and trades sequenced so a utility timeline or an equipment lead time never gates the schedule. From a single 80-ton chiller to 300 systems across three communities, the method is the same.