Take a 1,000-unit multifamily property that is twenty years old. Most deals trading today are older vintage, so this is the common case rather than the exception. A property like that generates about 1,000 service calls a year to outside HVAC vendors.
That is 1,000 hot and unhappy residents, 1,000 negotiations between a property manager and a third party, and 1,000 line items of maintenance spend nobody controlled. Deferral does not show up as one large failure. It shows up as a thousand small ones.
The model
To size what that is worth, we use a simple illustrative model: 1,000 units at $150,000 a door, a $150M valuation, a $45M equity check and a 5.5% exit cap rate. Three levers move the value, and each one sits at a different stage of the hold.
| Lever | When | What moves | Value |
|---|---|---|---|
| 1. Inspection | Before the deposit goes hard | $10,500 a door of real cost identified | +$10.5M |
| 2. Opex to capex | During the hold | $600K a year shifts from surprise opex to planned capex | +$11.0M |
| 3. Planned maintenance | During the hold | 25% off the remaining $400K of maintenance spend | +$2.3M |
| Total | $150.0M becomes $173.8M | +$23.8M |
Lever 1: understand real costs before closing
The first number is the one you find before you go hard. A unit census across HVAC, ductwork, electrical and roofing puts the real capital need in front of the investment team while it can still change the price or the financing.
- HVAC: $7,000 a system across 50% of units, $3.5M
- Ductwork: $2,000 a unit, $2.0M
- Electrical: $2,000 a unit, $2.0M
- Roofing: $3,000 a unit, $3.0M
That is $10,500 a door, or $10.5M across the property. The point is not to kill the deal. It is to make sure you do not overpay, and that capex financing is in place to maintain the property properly through the ownership life cycle.
Lever 2: surprise opex becomes planned capex
Emergency replacements land in operating expense, one failed unit at a time, at emergency pricing. Replacing 75 units a year on a schedule moves about $600,000 a year out of opex and into a planned capital line. At a 5.5% cap rate, $600,000 of recovered net operating income is worth about $10.9M at exit.
The work is the same work the building needed anyway. What changes is that it is the right work, done the right way, at a reasonable price, and that it is classified where a buyer will underwrite it.
Lever 3: a planned maintenance program
After replacement is moved to capital, about $400,000 a year of maintenance spend remains. A planned program cuts that by 25% or more through upfront pricing on a wide range of service issues, 20 to 30% fewer technician and property management hours, and better rates from vendors. That is $100,000 a year of savings and NOI, worth roughly $1.8M at the exit cap, plus about $500,000 of cash retained over the hold.
Planned or unplanned: same building
Unplanned, the building delivers less certainty through the deal life cycle, unhappy tenants, unforeseen emergency work and equipment of unknown status. Planned, the same building maximizes value at each stage, improves tenant satisfaction and retention, produces steadier cash flow, lets property management focus on its real value drivers, and opens the door to energy and insurance savings.
Written by the Air Force Mechanical team from field assessments and active programs.
General guidance only. Confirm code and regulatory requirements for your property.